ADU Regulations in Anaheim, California
Orange County · CA · Pop. 350,000
Anaheim runs an ADU Express program: a qualifying new detached ADU on a single-family lot built from a city pre-approved plan can clear review in 1 to 3 days with no design cost. Before applying you need written confirmation of sewer capacity from Public Works. Detached units need 10 ft of separation from the main house.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$140,000 – $300,000
Local Rules
What's Different in Anaheim
- ›ADU Express: pre-approved detached plans reviewed in 1 to 3 days on qualifying single-family lots
- ›Written sewer capacity verification from Public Works (PWPermits@anaheim.net) is required with the application
- ›Detached ADUs need a minimum 10 ft separation from the main dwelling
- ›Multifamily lots may add up to 8 detached ADUs at 18 ft (plus 2 ft for roof pitch)
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
ADUs permitted by-right on residential lots per state law
Source: City of Anaheim: Accessory Dwelling Units · Anaheim Municipal Code Section 18.38.015
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 16 ft (detached, single-family lot); 18 ft plus 2 ft for roof pitch for detached ADUs on multifamily lots
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone
Detached ADUs over 800 sq ft may trigger additional design review in some zones
Permitting
Permit Process
Department
Anaheim Planning & Building Department
Review Timeline
60 days
Permit Fees
$6,000 – $14,000
Impact Fees
Impact fees waived for ADUs under 750 sq ft
Required Documents
- ›Plot/site plan
- ›Architectural floor plans
- ›Exterior elevations
- ›Title 24 energy calculations
- ›Grading and drainage plan (if applicable)
Anaheim participates in OC ADU resource network
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Anaheim
Typical Build Cost
$140,000 – $300,000
Cost per Sq Ft
$200 – $280
Monthly Rental
$1,600 – $2,800/mo
Property Value Added
Adds $150,000 – $280,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Orange County construction costs run slightly below LA County
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Anaheim
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Anaheim
Anaheim can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Anaheim: Accessory Dwelling Units (Anaheim Municipal Code Section 18.38.015)
- Anaheim Municipal Code 18.38.015 Accessory Dwelling Units
- Anaheim ADU Submittal Requirements Checklist
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Orange County
Anaheim Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$140,000 – $300,000
- Rental income$1,600 – $2,800/mo
- Owner occupancyNot required
Official Source
City of Anaheim: Accessory Dwelling UnitsAnaheim Municipal Code Section 18.38.015
Last verified: September 30, 2026