Verified March 14, 2026

ADU Regulations in Fairfield, California

Solano County · CA · Pop. 120,000

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$145,000 – $295,000

Zoning

Allowed ADU Types

Detached ADU
Attached ADU
JADU (Junior ADU)
Garage Conversion
Max per lot: 2 ADUs✓ No owner-occupancy required

ADUs and JADUs permitted by right on any residentially zoned lot with an existing or proposed dwelling unit. State law preempts any local owner-occupancy conditions.

Source: City of Fairfield — Accessory Dwelling Units · Fairfield Municipal Code Title 25 (Zoning Ordinance)

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling per underlying zone

side

4 ft

rear

4 ft

Max height: 16 ft

Lot coverage: Per underlying zone

Garage conversions and existing structure conversions may maintain existing (non-conforming) setbacks. Standard 800 sq ft ADU allowed regardless of lot coverage on most residential lots.

Permitting

Permit Process

Department

City of Fairfield — Community Development Department, Planning Division

Review Timeline

60 days

Permit Fees

$5,500 – $11,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; prorated for larger units

Required Documents

  • Site plan with property dimensions and setbacks
  • Floor plans
  • Elevations
  • Title 24 energy compliance report
  • Structural drawings
  • Grading and drainage plan (if applicable)

Fairfield's location along the I-80 corridor between Sacramento and the Bay Area attracts commuter renters. Travis AFB generates consistent military family rental demand, supporting strong ADU occupancy rates.

Visit City of Fairfield — Community Development Department, Planning Division

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Not required

Separate Meter

Optional

Fire Sprinklers

See note

Sewer: Connection to Fairfield-Suisun Sewer District required; separate lateral typically required for detached ADUs
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Fairfield

Typical Build Cost

$145,000 – $295,000

Cost per Sq Ft

$200 – $265

Monthly Rental

$1,400 – $2,200/mo/mo

Property Value Added

Adds $110,000 – $200,000 to property value

Available Grants & Programs

  • CalHFA ADU Grant Program available (up to $40,000)

Travis AFB proximity creates consistent military rental demand. The I-80 corridor location attracts Bay Area and Sacramento commuters. Below-median construction costs make Fairfield a relatively affordable ADU market in the greater Bay Area region.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Fairfield

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: March 14, 2026. Verify with City of Fairfield — Community Development Department, Planning Division

Fairfield Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$145,000 – $295,000
  • Rental income$1,400 – $2,200/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Fairfield ADU contractors, no obligation.

Get My Free Quotes

Official Source

City of Fairfield — Accessory Dwelling Units

Fairfield Municipal Code Title 25 (Zoning Ordinance)

Last verified: March 14, 2026

Stay Updated

ADU rules change often.

Get notified when Fairfield's regulations update, plus guides on permitting and financing.