Fremont caps new attached ADUs at 1,000 sq ft and detached ADUs at 1,200 sq ft, under rules the City Council updated in 2023. Attached ADUs can reach 30 ft and two stories where the zone allows, which is more generous than the state minimum. The city publishes preapproved ADU plans, and each ADU needs its own permit even when built alongside other work on the house.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$200,000 – $420,000
Local Rules
What's Different in Fremont
- ›New attached ADUs max 1,000 sq ft; detached ADUs max 1,200 sq ft
- ›Attached ADUs up to 30 ft or the zone limit and two stories
- ›Preapproved ADU plans are available from the city
- ›An ADU requires its own permit, separate from other work on the primary home
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
ADUs permitted by-right on all residential zoned lots
Source: City of Fremont: Accessory Dwelling Units · Fremont Municipal Code Section 18.190.005 (Ordinance 06-2023)
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
1,000 sq ft for new construction
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 16 ft detached (18 ft within 1/2 mile of major transit); attached up to 30 ft or the zone height limit, whichever is lower, max two stories
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone
Fremont's large lot sizes in many neighborhoods allow full-size detached ADUs
Permitting
Permit Process
Department
Fremont Planning & Building Department
Review Timeline
60 days
Permit Fees
$10,000 – $20,000
Impact Fees
Impact fees waived under 750 sq ft
Required Documents
- ›Site plan to scale
- ›Architectural drawings
- ›Elevations
- ›Title 24 energy compliance
- ›Structural drawings (new construction)
Fremont's pre-approved ADU plan library speeds up the permit process
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Fremont
Typical Build Cost
$200,000 – $420,000
Cost per Sq Ft
$280 – $380
Monthly Rental
$2,200 – $3,500/mo
Property Value Added
Adds $220,000 – $400,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Bay Area labor costs are high; Fremont's proximity to Silicon Valley drives strong rental demand
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Fremont
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Fremont
Fremont can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Fremont: Accessory Dwelling Units (Fremont Municipal Code Section 18.190.005 (Ordinance 06-2023))
- City of Fremont: Preapproved Accessory Dwelling Units (ADUs)
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Fremont Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$200,000 – $420,000
- Rental income$2,200 – $3,500/mo
- Owner occupancyNot required
Official Source
City of Fremont: Accessory Dwelling UnitsFremont Municipal Code Section 18.190.005 (Ordinance 06-2023)
Last verified: September 30, 2026
Stay Updated
ADU rules change often.
Get notified when Fremont's regulations update, plus guides on permitting and financing.