Verified September 30, 2026

ADU Regulations in Glendale, California

Los Angeles County · CA · Pop. 200,000

Glendale caps ADUs at 850 sq ft for one bedroom and 1,000 sq ft for two or more bedrooms, below the 1,200 sq ft many cities allow. Units over 800 sq ft must also fit within the zone's floor area ratio and lot coverage, which matters on the city's many hillside lots. The city has started a pre-approved ADU plan program, beginning with a 740 sq ft one-bedroom design.

Max ADU Size

1,000

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$160,000 – $370,000

Local Rules

What's Different in Glendale

  • ›Max ADU size: 850 sq ft (1 bedroom) or 1,000 sq ft (2+ bedrooms)
  • ›ADUs over 800 sq ft are subject to zone FAR and lot coverage limits
  • ›Pre-approved plan program started with a 740 sq ft, 1 bedroom design
  • ›Hillside lots may face slope and grading requirements

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

Hillside lots may have additional slope and grading requirements

Source: City of Glendale: Accessory Dwelling Unit · Glendale Municipal Code Chapter 30.34 (Standards for Specific Uses)

Dimensions

Size & Setback Requirements

Detached

1,000

sq ft max

JADU

500

sq ft max

Attached

850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms); units over 800 sq ft count toward zone FAR and lot coverage

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 16 ft (hillside overlay may restrict further)

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per zone; hillside overlay applies to sloped lots

Many Glendale properties are on hillside lots; verify slope restrictions with planning

Permitting

Permit Process

Department

Glendale Community Development Department

Review Timeline

60 days

Permit Fees

$9,000 – $20,000

Impact Fees

Impact fees waived under 750 sq ft

Required Documents

  • ›Site plan
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance
  • ›Geotechnical report (hillside lots)
  • ›Structural drawings

Glendale's online permit portal (CSS) handles ADU applications

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Glendale Water & Power; connect to existing lateral
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Glendale

Typical Build Cost

$160,000 – $370,000

Cost per Sq Ft

$230 – $320

Monthly Rental

$1,800 – $3,200/mo

Property Value Added

Adds $170,000 – $330,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)

Hillside lots add 15–30% to construction costs due to grading and access

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Glendale

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Glendale

Glendale can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: September 30, 2026. Verify with Glendale Community Development Department

Glendale Quick Facts

  • Max size1,000 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$160,000 – $370,000
  • Rental income$1,800 – $3,200/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Glendale ADU contractors, no obligation.

Get My Free Quotes

Official Source

City of Glendale: Accessory Dwelling Unit

Glendale Municipal Code Chapter 30.34 (Standards for Specific Uses)

Last verified: September 30, 2026

Stay Updated

ADU rules change often.

Get notified when Glendale's regulations update, plus guides on permitting and financing.