ADU Regulations in Rialto, California

San Bernardino County · CA · Pop. 105,000

Rialto offers a Pre-Selected ADU Plans Program with 11 plans from 499 to 1,200 sq ft (1 to 3 bedrooms), which homeowners license directly from the designer and submit with a site plan. Projects go to Planning first for an address letter, then to Building for plan check. Large Inland Empire lots make detached units the common choice.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$130,000 – $265,000

Local Rules

What's Different in Rialto

  • ›Pre-Selected ADU Plans Program: 11 plans, 499 to 1,200 sq ft
  • ›Planning issues an address letter before Building plan check
  • ›Parking exemption within half a mile walking distance of transit

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

State law preempts local owner-occupancy requirements. Rialto's residential zones feature large lots by Southern California standards, well-suited for detached ADUs. A single-family lot can have a conversion ADU, a JADU and a new detached ADU under state law.

Source: City of Rialto: Accessory Dwelling Units · Rialto Municipal Code Section 18.10.070

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

850 sq ft (1 bedroom) or 1,000 sq ft (2+ bedrooms), or 50% of primary home if larger, max 1,200 sq ft

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 16 ft or one story, whichever is less

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone

Rialto's Inland Empire lot sizes frequently exceed 7,000 sq ft, giving ample space for detached ADUs in rear yards. ADUs converted within an existing garage retain the structure's existing setbacks.

Permitting

Permit Process

Department

City of Rialto Community Development Department: Planning Division

Review Timeline

60 days

Permit Fees

$5,000 – $10,500

Impact Fees

Impact fees waived for ADUs under 750 sq ft per state law

Required Documents

  • ›Site plan
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance
  • ›Structural drawings
  • ›Soils report (if required by site conditions)

Rialto maintains streamlined ADU processing per state law. Lower land costs and fees compared to Los Angeles or Orange County make ADU ROI strong in this Inland Empire city. Contact the Community Development counter for current fee schedule and pre-application availability.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connection to Rialto Municipal Utilities sewer system; lateral connection fee may apply
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Rialto

Typical Build Cost

$130,000 – $265,000

Cost per Sq Ft

$185 – $245

Monthly Rental

$1,300 – $2,000/mo/mo

Property Value Added

Adds $130,000 – $240,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
  • ★San Bernardino County housing assistance programs

Rialto is an Inland Empire logistics hub with major Amazon fulfillment centers and warehouse employers driving steady housing demand from working families. Lower land and construction costs relative to coastal cities make Rialto one of California's most affordable ADU markets with solid rental returns.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Rialto

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Rialto

Rialto can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with City of Rialto Community Development Department: Planning Division

Rialto Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$130,000 – $265,000
  • Rental income$1,300 – $2,000/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Rialto ADU contractors, no obligation.

Get My Free Quotes

Stay Updated

ADU rules change often.

Get notified when Rialto's regulations update, plus guides on permitting and financing.