Burbank has its own Pre-Approved ADU Program (BPAP) with a library of plans that skip architectural, structural and energy plan check, aiming for permits in about 30 days. Height rules are more detailed than state law: detached units top out at 17 ft (18 ft near transit), while units over a garage can reach 23 ft. Any part of an ADU with interior height over 12 ft counts as two stories for floor area.

Max ADU Size

1,000

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$175,000 – $360,000

Local Rules

What's Different in Burbank

  • ›Burbank Pre-Approved ADU Program (BPAP) plans skip most plan check reviews
  • ›Detached ADUs 17 ft max, 18 ft within 1/2 mile of a major transit stop
  • ›ADUs above a garage: 20 ft to top of plate, 23 ft overall
  • ›Interior height over 12 ft is counted twice toward floor area
  • ›Detached ADUs capped at 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms); 800 sq ft in the Mountain Fire Zone

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

State law preempts local owner-occupancy requirements. Burbank is home to Disney, Warner Bros., and NBC Universal Studios; entertainment industry workers represent a prime ADU renter demographic with above-average incomes and strong tenancy stability.

Source: City of Burbank: ADU / Accessory Dwelling Units · Burbank Municipal Code Chapter 10-1-1900 (Accessory Dwelling Units)

Dimensions

Size & Setback Requirements

Detached

1,000

sq ft max

JADU

500

sq ft max

Attached

800 sq ft or 50% of the main home, whichever is greater, max 1,000 sq ft (800 sq ft in the Mountain Fire Zone)

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 17 ft detached (18 ft within 1/2 mile of transit); 20 ft plate / 23 ft overall above a garage; attached 20 ft plate / 30 ft overall

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone; R-1 zones typically permit up to 40% lot coverage; state law overrides if necessary for 800 sq ft ADU

Detached ADUs: 850 sq ft max for a studio or one bedroom, 1,000 sq ft max with two or more bedrooms; 800 sq ft max for any ADU in the Mountain Fire Zone. Burbank's hillside and flatland neighborhoods each have design context guidelines. Hillside areas may have additional slope and grading requirements. Flat-lot neighborhoods near studios are optimal for standard ADU construction.

Permitting

Permit Process

Department

City of Burbank Community Development Department: Planning Division

Review Timeline

60 days

Permit Fees

$9,000 – $18,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; proportional fees apply above that threshold

Required Documents

  • ›Site plan (to scale)
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance (CalGreen)
  • ›Structural drawings
  • ›Geotechnical report for hillside parcels
  • ›Landscape/water efficiency plan

Burbank has a reputation for efficient permitting. ADU applications are processed ministerially without discretionary review. Burbank Water and Power (municipal utility) connection fees assessed separately; typically lower than LA DWP.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: City of Burbank Public Works (municipal sewer); connection fees apply for new service
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Burbank

Typical Build Cost

$175,000 – $360,000

Cost per Sq Ft

$245 – $320

Monthly Rental

$1,900 – $3,100/mo/mo

Property Value Added

Adds $250,000 – $460,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
  • ★LA County Community Development Authority programs

Among the strongest ADU rental markets in the San Fernando Valley. Entertainment industry grip/electric/production workers, studio executives, and writers consistently seek well-designed ADUs near the studios. Proximity to Hollywood Burbank Airport adds additional renter pool.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Burbank

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Burbank

Burbank can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with City of Burbank Community Development Department: Planning Division

Burbank Quick Facts

  • Max size1,000 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$175,000 – $360,000
  • Rental income$1,900 – $3,100/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Burbank ADU contractors, no obligation.

Get My Free Quotes

Official Source

City of Burbank: ADU / Accessory Dwelling Units

Burbank Municipal Code Chapter 10-1-1900 (Accessory Dwelling Units)