Citrus Heights offers free permit-ready ADU plans (499 to 749 sq ft, one and two bedrooms) that skip the design and plan review stage and save more than $7,000. Sizes stay under 750 sq ft, so impact fees do not apply. Typical 6,000 to 8,000 sq ft lots fit a detached unit without much trouble.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$140,000 – $285,000

Local Rules

What's Different in Citrus Heights

  • ›Free Permit-Ready ADU plans from 499 to 749 sq ft
  • ›Permit-ready designs include accessibility features such as wider doorways
  • ›Sewer service is through the regional sanitation district, not the city

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

Citrus Heights is a Sacramento suburb incorporated in 1997 with a predominantly single-family residential character. Light rail access to downtown Sacramento makes it an attractive ADU investment market for commuters. The city has streamlined ADU permitting to align with state law and regional housing goals.

Source: City of Citrus Heights: Accessory Dwelling Units · Citrus Heights Municipal Code Title 106 (Zoning), Chapter 106.42 (Standards for Specific Land Uses)

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

60% of primary home, max 1,200 sq ft (at least 850 sq ft for 0 to 1 bedroom, 1,000 sq ft for 2+ bedrooms)

Setbacks

front

Same as primary dwelling per underlying zone

side

4 ft

rear

4 ft

Max height: 18 ft detached (plus 2 ft to match the main home's roof pitch); 25 ft above a detached accessory structure; attached per zone

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone; typically 40–45% in RD zones

Citrus Heights lots range from compact post-war subdivisions to larger semi-rural parcels. Mid-size lots (6,000–8,000 sq ft) are typical and generally accommodate detached ADUs without difficulty. Detached ADUs over 800 sq ft must stay within lot coverage limits.

Permitting

Permit Process

Department

City of Citrus Heights Community Development Department: Planning Division

Review Timeline

60 days

Permit Fees

$5,500 – $11,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; proportional fees apply above that threshold

Required Documents

  • ›Site plan (to scale, showing lot dimensions, all structures, setbacks)
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance (residential)
  • ›Structural drawings

Citrus Heights offers one of the more affordable ADU permitting processes in the Sacramento metro area. The Sacramento Regional County Sanitation District handles sewer service for most of Citrus Heights. The city's planning counter is open Monday–Friday and accepts digital applications.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Sacramento Regional County Sanitation District (SRCSD) provides sewer service; lateral connection fees apply
Fire Sprinklers: Not required unless the primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Citrus Heights

Typical Build Cost

$140,000 – $285,000

Cost per Sq Ft

$195 – $260

Monthly Rental

$1,300 – $2,100/mo/mo

Property Value Added

Adds $145,000 – $280,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
  • ★Sacramento County Housing and Redevelopment Agency programs; check availability

Citrus Heights represents one of the most accessible ADU investment entry points in the Sacramento metro area. Build costs are significantly lower than Bay Area markets while rental demand is supported by Sacramento's growing tech, healthcare, and government employment base. Gold Line light rail (Sunrise and Citrus Heights stations) connects residents to downtown Sacramento without a car.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Citrus Heights

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Citrus Heights

Citrus Heights can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with City of Citrus Heights Community Development Department: Planning Division

Citrus Heights Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$140,000 – $285,000
  • Rental income$1,300 – $2,100/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Citrus Heights ADU contractors, no obligation.

Get My Free Quotes

Official Source

City of Citrus Heights: Accessory Dwelling Units

Citrus Heights Municipal Code Title 106 (Zoning), Chapter 106.42 (Standards for Specific Land Uses)