ADU Regulations in Elk Grove, California

Sacramento County · CA · Pop. 185,000

Elk Grove offers free city pre-approved ADU plans (a 625 sq ft one-bedroom and a 746 sq ft two-bedroom, updated to the 2025 codes), and also accepts designers' pre-approved and master plans. Both city plans stay under 750 sq ft, so impact fees do not apply. Many neighborhoods are master-planned with HOA design rules.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$120,000 – $260,000

Local Rules

What's Different in Elk Grove

  • ›Free city pre-approved plans: 625 sq ft one-bedroom and 746 sq ft two-bedroom
  • ›Master ADU plan and over-the-counter ADU programs for repeat designs
  • ›Site-specific zoning clearance still required with pre-approved plans

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

ADUs allowed by-right; Elk Grove has an ADU resource page with pre-approved designs

Source: City of Elk Grove: Accessory Dwelling Units · Elk Grove Municipal Code Chapter 23.90

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 16 ft

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone

Elk Grove's planned communities may have HOA design guidelines separate from city rules

Permitting

Permit Process

Department

Elk Grove Community Development

Review Timeline

60 days

Permit Fees

$5,000 – $11,000

Impact Fees

Impact fees waived under 750 sq ft

Required Documents

  • ›Site plan
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance
  • ›Structural drawings

Elk Grove's online permitting portal streamlines ADU applications

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Sacramento Area Sewer District (SASD); connect to existing lateral
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Elk Grove

Typical Build Cost

$120,000 – $260,000

Cost per Sq Ft

$170 – $240

Monthly Rental

$1,300 – $2,100/mo

Property Value Added

Adds $115,000 – $220,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)

Sacramento suburb with growing demand; lower costs than Bay Area

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Elk Grove

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Elk Grove

Elk Grove can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with Elk Grove Community Development

Elk Grove Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$120,000 – $260,000
  • Rental income$1,300 – $2,100/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Elk Grove ADU contractors, no obligation.

Get My Free Quotes

Stay Updated

ADU rules change often.

Get notified when Elk Grove's regulations update, plus guides on permitting and financing.