Verified October 4, 2026

ADU Regulations in Costa Mesa, California

Orange County · CA · Pop. 115,000

Costa Mesa runs a Safe ADU Legalization Program for owners of unpermitted units and has set up a pre-engineered ADU plan program. Plans are submitted electronically through the city's TESSA portal for combined Planning, Building, Public Works and Fire review. The city allows ADUs as small as 150 sq ft.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$175,000 – $360,000

Local Rules

What's Different in Costa Mesa

  • ›Safe ADU Legalization Program for existing unpermitted units
  • ›Pre-engineered ADU program for faster review
  • ›Minimum ADU size is 150 sq ft
  • ›Electronic plan check through TESSA

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

State law preempts local owner-occupancy requirements. JADUs allowed within existing single-family home footprint. Costa Mesa is adjacent to Newport Beach and South Coast Plaza, driving strong professional renter demand throughout the city.

Source: City of Costa Mesa: Accessory Dwelling Units · Costa Mesa Municipal Code Title 13 (Zoning)

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: Up to two stories, not taller than the main home allowed on the lot; at least 18 ft (plus 2 ft to match roof pitch) always allowed; detached ADUs on multifamily lots 16 ft; attached 25 ft or zone limit, whichever is lower

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone; detached ADUs on lots under 10,000 sq ft may reach up to 60%

Existing structures converted to ADUs must meet 4 ft side/rear setbacks or may use existing nonconforming setbacks where applicable.

Permitting

Permit Process

Department

Costa Mesa Development Services: Planning Division

Review Timeline

60 days

Permit Fees

$9,000 – $18,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; proportional fees apply above that threshold

Required Documents

  • ›Site plan (to scale)
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance (CalGreen)
  • ›Structural drawings
  • ›Grading/drainage plan if applicable

Orange County is served by OCSD for sewer; connection fees assessed separately. Ministerial review only; no discretionary approval required.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connection to Orange County Sanitation District (OCSD) system required; lateral connection fee applies
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Costa Mesa

Typical Build Cost

$175,000 – $360,000

Cost per Sq Ft

$245 – $320

Monthly Rental

$2,000 – $3,200/mo/mo

Property Value Added

Adds $250,000 – $450,000 to property value in strong OC market

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
  • ★Orange County Housing Finance Trust programs may apply

South Coast Plaza employment hub and Newport Beach proximity sustain high rental demand. Studio and 1-bed ADUs near the 405/55 interchange typically lease within 2 weeks.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Costa Mesa

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Costa Mesa

Costa Mesa can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with Costa Mesa Development Services: Planning Division

Costa Mesa Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$175,000 – $360,000
  • Rental income$2,000 – $3,200/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Costa Mesa ADU contractors, no obligation.

Get My Free Quotes

Stay Updated

ADU rules change often.

Get notified when Costa Mesa's regulations update, plus guides on permitting and financing.