ADU Regulations in Jurupa Valley, California
Riverside County · CA · Pop. 110,000
Jurupa Valley caps attached and detached ADUs at 850 sq ft for one bedroom and 1,000 sq ft for two or more, and requires them to match the main home's design, colors and materials. The City Council updated the ADU ordinance in October 2025 (Ordinance 2025-22) to reflect new state laws. Large former agricultural lots leave room for detached units, and sewer fees are charged separately by the water district.
Max ADU Size
1,000
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$130,000 – $270,000
Local Rules
What's Different in Jurupa Valley
- ›Max ADU size: 850 sq ft (1 bedroom) or 1,000 sq ft (2+ bedrooms)
- ›ADUs must match the primary home's architecture, colors and materials
- ›Ordinance 2025-22 adopted October 2, 2025; further ADU amendments were heard in May 2026
- ›Detached ADUs above a garage follow the zone height limit
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
State law preempts local owner-occupancy requirements. Jurupa Valley, incorporated in 2011, is one of California's newest cities. Large residential lots throughout the city provide excellent opportunities for detached ADUs; affordable costs relative to coastal markets attract IE commuters.
Source: City of Jurupa Valley: Accessory Dwelling Units · Jurupa Valley Municipal Code Title 9 (Land Use and Zoning)
Dimensions
Size & Setback Requirements
Detached
1,000
sq ft max
JADU
500
sq ft max
Attached
850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms); an 800 sq ft ADU is always allowed
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 16 ft (detached); matches primary structure height limit if attached
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone; typical R-1 zones allow 40% lot coverage
Many parcels in Jurupa Valley have agricultural-residential histories with large lot sizes, giving ample space for sizable detached ADUs without triggering coverage issues.
Permitting
Permit Process
Department
Jurupa Valley Planning Department
Review Timeline
60 days
Permit Fees
$5,500 – $11,000
Impact Fees
Impact fees waived for ADUs under 750 sq ft; proportional fees apply above that threshold
Required Documents
- ›Site plan (to scale)
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance (CalGreen)
- ›Structural drawings
- ›Grading plan if terrain alteration required
As a newer city, Jurupa Valley adopted a streamlined ADU ordinance aligned with state law from the outset. Fees are among the most affordable in Southern California. Western Municipal Water District sewer connection fees assessed separately.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Jurupa Valley
Typical Build Cost
$130,000 – $270,000
Cost per Sq Ft
$185 – $250
Monthly Rental
$1,300 – $2,100/mo/mo
Property Value Added
Adds $150,000 – $280,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★Riverside County CDBG programs may apply
One of the most cost-effective ADU markets in Southern California. IE commuters working in Riverside, Ontario, and San Bernardino drive steady rental demand. Build costs well below coastal averages improve ROI timelines.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Jurupa Valley
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Jurupa Valley
Jurupa Valley can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Jurupa Valley: Accessory Dwelling Units (Jurupa Valley Municipal Code Title 9 (Land Use and Zoning))
- City of Jurupa Valley: ADU Summary Sheet
- City of Jurupa Valley: Ordinance No. 2025-22 (ADU)
- HCD: Jurupa Valley ADU Ordinance Technical Assistance Letter (Dec 2025)
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Riverside County
Jurupa Valley Quick Facts
- Max size1,000 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$130,000 – $270,000
- Rental income$1,300 – $2,100/mo/mo
- Owner occupancyNot required
Official Source
City of Jurupa Valley: Accessory Dwelling UnitsJurupa Valley Municipal Code Title 9 (Land Use and Zoning)
Last verified: September 30, 2026