ADU Regulations in Riverside, California
Riverside County · CA · Pop. 315,000
Riverside allows detached ADUs up to 1,200 sq ft and heights up to 30 ft, but any ADU taller than 16 ft must meet the side and rear setbacks of the main house. The Dwell Riverside program offers free permit-ready plans from 746 to 1,200 sq ft in Craftsman, Ranch and Spanish styles. ADUs on historic properties follow separate design standards.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft for one-story ADUs; ADUs over 16 ft must meet primary dwelling setbacks
Permit Timeline
60 days
Build Cost
$110,000 – $240,000
Local Rules
What's Different in Riverside
- ›Dwell Riverside permit-ready plans: 746, 800, 1,020 and 1,200 sq ft
- ›One-story ADUs: 4 ft side and rear setbacks
- ›ADUs over 16 ft follow primary dwelling setbacks
- ›Historic properties follow ADU design standards
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
Riverside follows California state ADU law; ministerial approval required
Source: City of Riverside: ADU Information · Riverside Municipal Code Chapter 19.630
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling
side
4 ft for one-story ADUs; ADUs over 16 ft must meet primary dwelling setbacks
rear
4 ft for one-story ADUs; ADUs over 16 ft must meet primary dwelling setbacks
Max height: Up to 30 ft; detached ADUs in the RC zone limited to 20 ft
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per zone regulations; ADU coverage exempted up to 800 sq ft
Riverside's larger lots in older neighborhoods are well-suited for detached ADUs
Permitting
Permit Process
Department
Riverside Community & Economic Development Department
Review Timeline
60 days
Permit Fees
$5,000 – $11,000
Impact Fees
Impact fees waived under 750 sq ft
Required Documents
- ›Site plan
- ›Architectural plans
- ›Elevations
- ›Title 24 energy compliance
- ›Structural drawings (new construction)
Online permit portal available for initial submittal
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Riverside
Typical Build Cost
$110,000 – $240,000
Cost per Sq Ft
$160 – $230
Monthly Rental
$1,200 – $2,100/mo
Property Value Added
Adds $100,000 – $200,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Inland Empire costs are lower than coastal markets; labor is readily available
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Riverside
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Riverside
Riverside can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Riverside: ADU Information (Riverside Municipal Code Chapter 19.630)
- City of Riverside: Accessory Dwelling Units FAQs
- City of Riverside: Permit-Ready ADU Plans
- City of Riverside: Dwell Riverside
- City of Riverside: ADU Design Standards for Historic Properties
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Riverside County
Riverside Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft for one-story ADUs; ADUs over 16 ft must meet primary dwelling setbacks
- Permit timeline60 days
- Build cost$110,000 – $240,000
- Rental income$1,200 – $2,100/mo
- Owner occupancyNot required
Official Source
City of Riverside: ADU InformationRiverside Municipal Code Chapter 19.630
Last verified: September 30, 2026