Verified October 4, 2026

ADU Regulations in Murrieta, California

Riverside County · CA · Pop. 115,000

Murrieta keeps a pre-approved ADU plan library (Information Bulletin IB-113): plans are submitted by private architects and designers, and homeowners contact the plan owner for permission to use them. Building and Safety bulletin IB-108 sets 4 ft side and rear setbacks and lets converted legal garages keep existing setbacks. Many neighborhoods are HOA-governed planned developments with their own design rules.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$145,000 – $295,000

Local Rules

What's Different in Murrieta

  • ›Pre-approved ADU plan library (IB-113) with designer-owned plans; up to four options per plan set
  • ›4 ft side and rear setbacks; existing setbacks may be kept for converted legal garages or accessory structures (IB-108)
  • ›HOA CC&Rs in planned developments may add design standards

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

ADUs and JADUs permitted by right on all residentially zoned lots. Murrieta is a fast-growing Southwest Riverside County city popular with San Diego and Orange County commuters. State law prohibits owner-occupancy requirements.

Source: City of Murrieta: Accessory Dwelling Units · Murrieta Municipal Code Title 16 (Development Code), Chapter 16.44

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling per underlying zone

side

4 ft

rear

4 ft

Max height: 16 ft

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone; planned developments may have stricter HOA-level coverage rules

Many Murrieta neighborhoods are within HOA-governed planned developments. HOA CC&Rs may impose design standards on top of city minimums; always verify with the HOA before submitting. Newer tracts typically have larger lots well-suited for detached ADUs.

Permitting

Permit Process

Department

City of Murrieta: Community Development Department, Planning Division

Review Timeline

60 days

Permit Fees

$6,000 – $12,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; prorated for larger units

Required Documents

  • ›Site plan with property dimensions and setbacks
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance report
  • ›Structural drawings
  • ›HOA approval letter (if applicable)

Murrieta's permit fees are moderate for the Inland Empire. The city processes ADU applications in compliance with state law's 60-day ministerial review requirement. HOA approval, while not a city requirement, should be obtained before beginning work.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connection to Eastern Municipal Water District (EMWD) sewer required; separate service lateral may be required for detached ADUs
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Murrieta

Typical Build Cost

$145,000 – $295,000

Cost per Sq Ft

$200 – $265

Monthly Rental

$1,500 – $2,400/mo/mo

Property Value Added

Adds $120,000 – $220,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)

Southwest Riverside County's continued growth and popularity with San Diego and Orange County commuters drives strong ADU rental demand. Murrieta's family-oriented reputation and top-rated schools make it particularly attractive for multigenerational ADU arrangements.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Murrieta

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Murrieta

Murrieta can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with City of Murrieta: Community Development Department, Planning Division

Murrieta Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$145,000 – $295,000
  • Rental income$1,500 – $2,400/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Murrieta ADU contractors, no obligation.

Get My Free Quotes

Official Source

City of Murrieta: Accessory Dwelling Units

Murrieta Municipal Code Title 16 (Development Code), Chapter 16.44

Last verified: October 4, 2026